20-Slot 200kW Whatsminer 2U Integrated Hydro Cooling Rack
Designed for Whatsminer hydro miners, this hydro cooling cabinet supports 20 M53, M63, or M73 units as an integrated all-in-one cooling and deployment solution with a 200kW cooling capacity.
$11,820.00 – $12,800.00Price range: $11,820.00 through $12,800.00
Not Fitting Your Site?
Tell us your mining capacity and site requirements, and we'll recommend the right hydro-cooling container for your deployment.
How your container order works
Submit form
Tell us delivery country & site details
Get your quote
Complete pricing within 24 hours
Expert review
Discuss specs, customise setup
DDP delivery
Container shipped to your site
Industrial-scale farms deploying 200+ hydro-cooled ASICs.
CONTAINER CAPACITY
20 UNITS
Housed at full load
200 KW
Continuous electrical load
Custom
Standard
Hydro
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 15 days • DDP Sea Shipping Available
View More ›
Show 10 more models
Product Description
Designed for professional WhatsMiner 2U hydro mining deployments, this 20-slot 200kW integrated hydro cooling rack combines miner installation, liquid cooling, and heat management into one complete solution.
The all-in-one cabinet design simplifies deployment by integrating key cooling components into a compact structure, reducing installation complexity and improving space utilization. With a plug-and-play design, users can quickly connect power and complete basic setup for efficient mining operation. The dedicated liquid circulation system and optimized thermal management provide stable cooling performance for continuous workloads.
Suitable for home mining, warehouses, and indoor deployment environments with available space, this integrated hydro cooling rack offers a compact and efficient solution for operators seeking a convenient way to deploy multiple ASIC miners with minimal installation requirements.
Core Advantages
01. Specialized 2U Slots & Manifolds
The rack features 20 dedicated 2U slots with a specialized manifold system. Every miner has its own water connection points, ensuring a perfect fit and even liquid distribution for stable cooling during hashing daily.
02. Organized Power Cabinet Wiring
The power cabinet features neatly organized wiring and utilizes UL-compliant components to meet safety standards. This clean layout simplifies troubleshooting and ensures long-term fire safety for your facility now.
03. Independent Switch for Each Slot
Every slot has its own power switch and breaker. This one-miner, one-control design allows you to turn off a single machine for maintenance without stopping the rest of the rack, maximizing your overall mining uptime now.
04. Reliable Leak Detection Safety
A moisture-sensing rope is installed at the bottom to detect any coolant leaks. If fluid is found, the system triggers an instant alert, protecting your hardware from water damage and keeping your facility safe daily now.
05. Complete CDU System Function
The CDU includes a heavy-duty pump, expansion tank, and heat exchanger. It maintains stable pressure and circulation, moving the 200kW heat load from the miners to the outside radiator for continuous thermal balance now.
06. Customizable PLC Control Hub
The PLC system monitors data automatically and can be customized for your site needs. The clear HMI screen shows all real-time pressure and temperature, ensuring safe and efficient system operation at all times now.
Full Specifications
External dimensions
L:1460mm、W:1000mm、H:2200mm
Internal dimensions
L:1410mm、W:950mm、H:2150mm
Weight
500KG
|
Model |
AP-M20 |
Installed capacity |
20 Seat |
|
Installed powerload |
200 kW |
Power of the light-duty vertical multistage pump |
4 kW |
|
Power of the fluid replenishing pump |
0.2 kW |
Total power of the dry cooling tower fan |
8.3 kW |
|
Total power of the closed cooling tower fan |
3 kW |
Total power of the closed cooling tower spray pump |
1.1 kW |
|
System pipeline pressure |
0.2-0.4 MPA |
Operating temperature range of the system |
0-50 ℃ |
|
Coolant circulation demand of a single machine |
≥0.6 m³/h |
Total demand for circulating coolant within the system |
≥0.25 m³ |
|
Residual Current Circuit Breaker |
400 A |
Contactor |
9 A |
|
Intermediate relay |
24 V |
CUL certified frequency converter |
380 V |
20-Slot Whatsminer Hydro Cooling Rack Product Brochure
Complete product specifications, installation guide, and operational instructions.
Certification Standards
Our products meet leading international standards for safety, reliability, and performance.
China Classification Society
Marine & offshore compliance
UL Listed
Safety tested & certified
CSA Certified
North American compliance
CE Marking
European conformity
Complete Cooling Solutions
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
|
❄️ Cooling Capacity |
|
⚙️ Miner Slots |
|
📏 Dimensions (L × W × H) |
|
🏢 Application |
12-Slot Integrated Whatsminer Hydro Cooling Rack
|
120 kW |
|
12 Slots |
|
8,50 × 1,000 × 2,130 mm |
|
Home & Professional Offices |
Compare
20-Slot Integrated Whatsminer Hydro Cooling Rack
|
200 kW |
|
20 Slots |
|
1,460 × 1,000 × 2,200 mm |
|
Mid-Sized Mining Clusters |
160-Slot Whatsminer Hydro Cooling Container
|
1.6 MW |
|
160 Slots |
|
6,058 × 2,438 × 2,896 mm |
|
Industrial Scale Facilities |
240-Slot Whatsminer Hydro Cooling Container
|
2.4 MW |
|
240 Slots |
|
1,3716 × 2,438 × 2,896 mm |
|
Enterprise Mega Infrastructure |
20-Slot Whatsminer Integrated Hydro Cooling Rack FAQs
Yes. The rack is designed for high-power and overclocked WhatsMiner M53, M63, and M73 Hydro deployments, with up to 200kW of total miner load.
WhatsMiner Hydro miners in these series can reach approximately 10kW per unit in high-performance operation, making this 200kW rack suitable for a fully populated 20-miner overclocking setup.
No. The 200kW rating refers to the total miner load of the complete rack, not a fixed 10kW limit for each individual position.
This allows the rack to accommodate different compatible WhatsMiner models or operating modes, as long as the combined miner load remains within the system's 200kW design capacity.
The rack provides a rated circulation flow of 13m³/h, with a minimum coolant circulation requirement of 0.6m³/h per miner.
For 20 miners, the minimum combined requirement is approximately 12m³/h. The rack uses an automatic pressure-regulating pump and PLC constant-flow control to maintain stable circulation across the system.
No. Each miner position is individually managed, so one miner can be taken offline for inspection or maintenance without treating the entire rack as a single operating unit.
This design helps reduce unnecessary downtime and makes a 20-miner deployment easier to operate and service.
The rack uses PLC-based 24/7 monitoring to track key operating conditions including power, temperature, coolant flow, pressure, and network status.
Abnormal conditions can be detected centrally, allowing operators to identify and respond to cooling or system issues before they develop into wider rack-level problems.
The rack is supplied as an integrated cooling system with factory-prepared piping, valves, power components, and the required quick-connect interfaces.
The corresponding quick connectors are prepared before shipment, allowing compatible WhatsMiner Hydro miners to connect directly to the rack's coolant supply and return lines and reducing additional field plumbing work.
For most single-rack 200kW deployments, a matched 200kW dry cooler is a practical choice when simple installation, low water consumption, and lower routine water-system maintenance are priorities. The rack can also be configured with a closed cooling tower.
For hotter climates or larger multi-rack sites where evaporative heat rejection provides an operational advantage, a closed cooling tower can be considered as part of the centralized cooling design. Dry coolers are generally preferred when water conservation and reduced maintenance are the main priorities.
Yes. The rack format is suitable for modular mining-farm expansion.
Five 200kW racks represent approximately 1MW of installed miner capacity. If future expansion is planned from the beginning, the site can reserve sufficient electrical capacity, main piping, heat-rejection capacity, installation space, and centralized monitoring interfaces so additional racks can be added without rebuilding the entire infrastructure.
