All-in-one Containerized Hydro Solutions
High Performance with Quality
- Efficient performance
- High-quality components
- Suitable from cold to heat
Fast Lead Time
- Mature manufacturing
- Core components in stock
- Deploy in 3 days
Worry-Free Warranty
- 1-year free FogCare
- Up to 10 years FogCare+
- 3-level spare parts
AP-HC20
HC20 Hydro Cooling Solution
20FT Hydro Cooling Container for Antminer S21/S19 Hydro
Precision Coolant Control
Ensures stable pressure, temperature, and flow rate for optimal mining performance and system longevity.
Integrated Control Cabinet
Smart control of the pump station and real-time sensor feedback to maintain reliable operation.
High Miner Capacity
Holds up to 210 Antminer S21/S19 Hydro units in one 20FT container, designed for high-density mining farms.
Power Distribution Cabinet
Built-in power cabinet simplifies energy management for efficient and safe power delivery.
HC40-1.2MW
HC40 Hydro Cooling Solution
1.2MW All-in-One Hydro Cooling Solution(Whatsminer/Antminer)
Pre-Integrated Dry Cooler
Dry cooler optionally designed for 45 °C for rapid deployment.
Built-in Power Distribution
UL489-certified Noark breakers, panels, and motors for ultra-reliable operation.
High-Density Capacity
Supports 120 × 2U miners or 84 × U3S21EXPH, maximizing space efficiency.
Management System
Real-time electrical monitoring and liquid cooling optimization.
HC40-2.4MW
Higher Density,Lower Costs
2.4MW Split-Type Hydro Cooling Solution(Whatsminer/Antminer)
Scalable 2MW Capacity
Supports 240 × 2U miners or 168 × U3S21EXPH
(optional 420 × custom Antminers).
Cost-Efficient Density
Lower equipment, deployment, and maintenance costs.
Adaptive PUE Control
Automatically adjusts cooling based on temperature, with low-temperature startup and high-temperature spray.
Reliability Components
UL489-compliant electrical panels and Noark breakers for robust performance.
TESTIMONIALS
Project Case Showcase
Coal to Electric Heating
Scale:4000kW
Coal saving 490 tons/month (coal combustion calorific value is about 4000 kcal/kg)
Smart Mining Farm
Scale:20MW
Reduced O&M by 1/5 and equipment failure rate by 80%
Constant Temperature Fish Farming
Scale:1MW
Fish farming combined with mining reduces the payback period to 6 months
Commercial Building Heating
Scale:10MW
Heat utilization for the whole building of 130,000 square meters
Custom Container Solutions for Your Mining Farm
We specialize in providing customized container solutions for your mining operations. Whether you're optimizing space or need a tailored design, we can create the perfect setup for you.
Solo Miner
Bitcoin
Dogecoin
Aleo
Kaspa
ALPH
Nexa
ETC
CKB
Dash
Kadena