1.2MW 210-Slot Antminer Hydro Mining Container (20HQ)

A 1.2MW 20ft hydro cooling container supporting up to 210 Antminer hydro miners, featuring advanced water-cooling for stable, high-performance mining.

    💬

    Customize Your Hydro Cooling Solution

    Share your requirements below. Our consultant will contact you via email, WhatsApp, or call within 24 hours with a custom setup and quote.

    Price range: $60,800.00 through $80,500.00

    Not Fitting Your Site?

    Tell us your mining capacity and site requirements, and we'll recommend the right hydro-cooling container for your deployment.

      💬

      Customize Your Hydro Cooling Solution

      Share your requirements below. Our consultant will contact you via email, WhatsApp, or call within 24 hours with a custom setup and quote.

      How your container order works

      1

      Submit form

      Tell us delivery country & site details

      2

      Get your quote

      Complete pricing within 24 hours

      3

      Expert review

      Discuss specs, customise setup

      4

      DDP delivery

      Container shipped to your site

      210-Slot Split-Type Flexible Modular Hydro Cooling Solution

      CONTAINER CAPACITY

      ASIC MINERS

      210 UNITS

      Housed at full load

      TOTAL POWER

      1200 KW

      Continuous electrical load

      FORM FACTOR

      Custom

      Standard

      COOLING

      Hydro

      Thermal management

      POWER INPUT

      380V–415V AC 50/60Hz

      AVAILABILITY

      Typical lead time 45 days • DDP Sea Shipping Available

      Product Description

      The 1.2MW 210-Slot Split-Type Antminer Hydro Mining Container 20FT HQ is a premier liquid cooling solution engineered for high-density Bitcoin mining in crypto mining farms.

      Featuring an integrated power distribution system and water circulation control in a compact frame, its split design separates external water cooling units from the chassis to minimize physical footprint.

      This modular architecture is ideal for irregular mining farm layouts and allows customizable heat dissipation using dry coolers or cooling towers. Crucially, it excels in long-term scalability, enabling operators to easily upgrade or expand liquid cooling components as BTC mining capacity grows without modifying the core ASIC miner container.

      Core Advantages

      01. Integrated All-in-One System

      Integrates the rack, CDU, power cabinet, and control unit into one container for rapid, plug-and-play deployment.

      02. Redundant Dual-Loop Cooling

      Features dual loops, dual CDUs, and multi-channel power to ensure continuous, reliable cooling during partial power outages.

      03. Individual Power Switches

      Equips each miner with an individual switch, enabling safe maintenance on single units without interrupting operations.

      04. Leak Detection System

      Uses moisture-sensing ropes to instantly detect coolant leaks and trigger alarms, preventing damage and ensuring safety.

      05. Premium Engineering Details

      Features supplier-certified aviation plugs, reinforced grid panels, and durable 304 stainless steel manifolds with ball valves.

      06. Intelligent Management System

      Monitors flow rate, pressure, and temperature via multi-sensor arrays, enabling real-time remote control and mobile/PC alerts.

      Full Specifications

      External dimensions

      L:6058mm、W:2438mm、H:2896mm

      Internal dimensions

      L:5860mm、W:2348mm、H:2720mm

      Weight

      4980KG

      Model

      AP-HC20-A210

      Installed capacity

      210 seat

      Installed powerload

      1155 KW

      Power of the light-duty vertical multistage pump

      30 kW

      Power of the fluid replenishing pump

      0.2 KW

      Total power of the dry cooling tower fan

      49.8 KW

      Total power of the closed cooling tower fan

      16.5 KW

      Total power of the closed cooling tower spray pump

      4 KW

      System pipeline pressure

      0.2-0.4 MPA

      Operating temperature range of the system

      22-42 ℃

      Coolant circulation demand of a single machine

      ≥0.5 m³/h

      Total demand for circulating coolant within the system

      ≥2.2 m³

      Molded Case Circuit Breaker

      125 A

      Residual Current Circuit Breaker

      630 A

      Contactor

      9 A

      Intermediate relay

      24 V

      CUL certified frequency converter

      380 V

      210-Slot 20FT Antminer Hydro Cooling Container Product Brochure

      Complete product specifications, installation guide, and operational instructions.

        Data download verification

        Downloadable materials: 1.2MW 210-Slot Antminer Hydro Mining Container (20HQ)

        Certification Standards

        Our products meet leading international standards for safety, reliability, and performance.

        China Classification Society

        Marine & offshore compliance

        UL Listed

        Safety tested & certified

        CSA Certified

        North American compliance

        CE Marking

        European conformity

        Complete Cooling Solutions

        We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.

        ❄️ Cooling Capacity

        ⚙️ Miner Slots

        📏 Dimensions (L × W × H)

        🏢 Application

        Compare

        210-Slot 20FT Antminer Hydro Container

        210-Slot 20FT Antminer Hydro Container

        1.2 MW

        210 Slots

        6058 × 2438 × 2896 mm

        Flexible Space & Modular Layouts

        210-Slot Integrated Antminer Hydro Container

        210-Slot 40FT Antminer Hydro Container

        1.2 MW

        210 Slots

        12192× 2438 × 2896 mm

        Turnkey Commercial Mining

        308-Slot Antminer Hydro Container

        308-Slot Antminer Hydro Container

        1.7 MW

        308 Slots

        12192 × 2438 × 2896 mm

        Industrial-Scale Operations

        420-Slot Antminer Hydro Container

        420-Slot Antminer Hydro Container

        2.4 MW

        420 Slots

        12192 × 2438 × 2896 mm

        Mega-Scale Mining Facilities

        Real Results from Real Miners

        View All  >>

        Apexto Abu Dhabi, United Arab Emirates 12 x 1.2MW Hydro Project
        Abu Dhabi, United Arab Emirates

        12 x 1.2MW Hydro Project

        Achieving water-free sustainable mining in dry desert climates.

        +28%

        Efficiency Gain

        -23%

        Energy Cost

        1.2M USD

        Energy Cost

        View All >>

        Apexto Calgary, Canada 8 x 1.2MW Hydro Project
        Calgary, Canada

        8 x 1.2MW Hydro Project

        Sustaining consistent thermal performance during freezing winter seasons.

        +100%

        On-Time Startup

        -25%

        Setup Time

        99.8%

        System Reliability

        View All >>

        Global Deployment

        1.2+ GW

        Cumulative delivered cooling capacity

        Serving Mining Sites

        50+

        Countries and regions covered

        210-Slot Antminer Hydro Cooling Container FAQs

        Can this 20FT container support up to 210 Antminer Hydro miners?

        Yes. The container provides 210 dedicated miner positions and is designed as a 1.2MW-class Hydro mining system for compatible Antminer Hydro miners.

        The final full-load configuration is matched to the exact miner model and operating power before deployment, ensuring the total electrical and cooling load remains within the system design capacity.

        Why choose a split-type 20FT container instead of a fully integrated cooling container?

        The split design keeps the mining racks, power distribution, CDU, and controls inside the compact 20FT container while placing the final heat-rejection equipment outside.

        This reduces the main container footprint and gives operators more freedom to position dry coolers or cooling towers according to the actual site layout. It also makes future cooling upgrades easier without rebuilding the miner container.

        What should be prepared on site before the container arrives?

        The main requirements are sufficient 380–415V three-phase electrical capacity, a suitable foundation for the container and external cooling equipment, clear routing for cooling pipes and electrical connections, and network access for system monitoring.

        Planning these items before delivery helps reduce on-site construction work and speeds up commissioning.

        What happens if one cooling loop or pump has a problem?

        The system uses dual cooling loops, dual CDUs, and multi-channel power architecture to provide cooling redundancy.

        This design reduces the risk that a single cooling-side failure will stop the entire 210-miner deployment and improves serviceability for continuous mining operations.

        Can one miner be serviced without shutting down the entire container?

        Yes. Each miner position has an individual power switch, allowing a single miner to be powered down for inspection, replacement, or maintenance without stopping the other operating miners.

        This is especially important in a 210-miner container because routine miner maintenance does not need to become container-wide downtime.

        How does the system detect and respond to coolant leaks?

        Moisture-sensing ropes are installed to detect coolant leakage and trigger an alarm when abnormal moisture is detected.

        The intelligent control system also monitors coolant flow, pressure, and temperature, allowing operators to identify cooling abnormalities remotely before they develop into larger system problems.

        Does a 1.2MW mining container mean the site only needs 1.2MW of electrical capacity?

        No. Site electrical planning should include the miner load plus the cooling and auxiliary equipment.

        The container uses circulation pumps, controls, and external heat-rejection equipment. Auxiliary power requirements also differ between dry-cooler and cooling-tower configurations, so the complete site electrical capacity should be calculated before deployment.

        Can the cooling system be upgraded if the mining farm expands later?

        Yes. This is one of the main advantages of the split-type architecture.

        The external heat-rejection system is separated from the core mining container, so cooling capacity can be expanded, replaced, or reorganized as the mining farm grows without replacing the complete miner container. This makes the system suitable for phased MW-scale expansion.