DELIVERED CASE STUDIES

Project Portfolio

Browse our portfolio of delivered infrastructure projects across advanced cooling, power systems, containerized mining, and turnkey deployment solutions.

Bavaria, Germany

50kW Antminer Hydro Cooling Rack home mining deployment case

Power Capacity

500kW

Status

Completed

Oslo, Norway

Antminer Hydro cooling home Mining Rack Deployment Case Study

Power Capacity

50kW

Status

Completed

Helsinki, Finland

12-Slot Antminer liquid Cooling Cabinet deployment case

Power Capacity

245kW

Status

Completed

Berlin, Germany

6-Slot antminer Hydro Mining Kit Deployment Case Study

Power Capacity

35kW

Status

Completed

Seoul, South Korea

4-Slot Antminer Hydro Miner Home Mining Deployment

Power Capacity

390kW

Status

Completed

London, United Kingdom

Antminer Hydro cooling home Mining Rack Deployment Case Study

Power Capacity

26kW

Status

Completed

Almaty, Kazakhstan

200kW-36-Slot-antminer-Hydro-cooling-Deployment

Power Capacity

800kW

Status

Operational

Abu Dhabi, UAE

200kW 36-Slot antminer Hydro Mining Deployment Case Study

Power Capacity

196kW

Status

Completed

Southeast Asia

154kW 28-Slot antminer Hydro Mining Rack Deployment Case Study

Power Capacity

1.4MW

Status

Operational

Oslo, Norway

Antminer Hydro cooling home Mining Rack Deployment Case Study

Power Capacity

50kW

Status

Completed

Berlin, Germany

6-Slot antminer Hydro Mining Kit Deployment Case Study

Power Capacity

35kW

Status

Completed

London, United Kingdom

Antminer Hydro cooling home Mining Rack Deployment Case Study

Power Capacity

26kW

Status

Completed

Texas, United States

1.4MW Antminer Hydro Cooling Container Project Cases

Power Capacity

16.8MW

Status

Operational

Ohio, United States

1.4MW Antminer Hydro Cooling Container Project Cases

Power Capacity

5.6MW

Status

Operational

Ekibastuz, Kazakhstan

Deployment Case Study: 480-Slot Antminer Hydro-Cooling Container

Power Capacity

26.4MW

Status

Completed

Bavaria, Germany

50kW Antminer Hydro Cooling Rack home mining deployment case

Power Capacity

500kW

Status

Completed

Helsinki, Finland

12-Slot Antminer liquid Cooling Cabinet deployment case

Power Capacity

245kW

Status

Completed

Seoul, South Korea

4-Slot Antminer Hydro Miner Home Mining Deployment

Power Capacity

390kW

Status

Completed

Almaty, Kazakhstan

200kW-36-Slot-antminer-Hydro-cooling-Deployment

Power Capacity

800kW

Status

Operational

Abu Dhabi, UAE

200kW 36-Slot antminer Hydro Mining Deployment Case Study

Power Capacity

196kW

Status

Completed

Southeast Asia

154kW 28-Slot antminer Hydro Mining Rack Deployment Case Study

Power Capacity

1.4MW

Status

Operational

Texas, United States

154kW 28-Slot antminer Hydro cooling rack Deployment Case Study

Power Capacity

1MW

Status

Completed

Tbilisi, Georgia

Water Liquid Cooling System for Antminer Hydro miner Solution

Power Capacity

660kW

Status

Completed

Oregon, United States

Antminer Hydro with Liquid Cooling Solution

Power Capacity

800kW

Status

Operational

Hamburg, Germany

200kW-36-Slot-antminer-Hydro-Mining-Rack-Deployment-Case-Study

Power Capacity

3.2MW

Status

Completed

Monterrey, Mexico

2.6MW Antminer Hydro Container Bitcoin Mining Farm Deployment Case Study

Power Capacity

31.68MW

Status

Completed

Luleå, Sweden

Antminer Hydro Cooling Container Case

Power Capacity

19.2MW

Status

Operational

Atlanta, United States

420-Slot Antminer Hydro Container Deployment Case Study

Power Capacity

28.8MW

Status

Operational

Reykjavik, Iceland

480-Slot Antminer Hydro Cooling Container Case Study

Power Capacity

12MW

Status

Operational

Edmonton, Canada

2.4 MW Slot Antminer Hydro Container Deployment Case Study

Power Capacity

28.8MW

Status

Operational

Addis Ababa, Ethiopi

Deployment Case Study: 2MW Antminer Hydro Mining Container

Power Capacity

25.2MW

Status

Operational

Dubai, UAE

Deployment Case Study: 364-Slot Antminer Hydro Mining Container

Power Capacity

21MW

Status

Operational

Tashkent, Uzbekistan

Antminer Hydro Cooling Container Case

Power Capacity

25.5MW

Status

Completed

CASE STUDY HIGHLIGHT

110+ MW Hydro Mining Infrastructure Project

Location

Ethiopia

Project Overview

In Ethiopia, Apexto delivered over 110 MW of utility-scale hydro cooling infrastructure, hosting a massive mixed fleet of more than 16,000 Antminer (S19, S21, 3U) and WhatsMiner (2U) hydro miners.

To support diverse hardware, Apexto supplied 49 custom containers (1.2MW to 2.4MW) with tailored slot configurations. Apexto provided full turnkey execution, managing everything from equipment manufacturing and global logistics to on-site installation and final commissioning.

Capacity

110+ MW

Deployment

Containerized

Cooling Method

Hydro Cooling

Status

Completed

Completion Time

2025

GLOBAL FOOTPRINT

Completed Projects Worldwide

Delivering reliable mining infrastructure solutions across strategic markets across the globe.

Ready to Build Your Mining Farm?

Share your power parameters and basic project details. Our engineering team will review your case and get in touch quickly to discuss your power layout, cooling plan, and budget estimate.