240-Slot 1.35MW Antminer Liquid Cooling Rack
This hydro cooling mining rack holds up to 240 Antminer S19, S21, or S23 Hydro miners with a 1.35MW cooling capacity.
Not Fitting Your Site?
Tell us your mining capacity and site requirements, and we'll recommend the right hydro-cooling container for your deployment.
How your container order works
Submit form
Tell us delivery country & site details
Get your quote
Complete pricing within 24 hours
Expert review
Discuss specs, customise setup
DDP delivery
Container shipped to your site
1.35MW 240-Slot Antminer Hydro Cooling Rack for Enterprise Indoor Mining
CONTAINER CAPACITY
240 UNITS
Housed at full load
1,350 KW
Continuous electrical load
Custom
Standard
Hydro
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 45 days • DDP Sea Shipping Available
View More ›





Show 1 more models
Product Description
The 240-Slot Antminer Hydro Cooling Rack is an industrial-grade indoor solution engineered for high-density, megawatt-scale crypto mining. Holding 240 Antminer S19/S21/S23 Hydro units across a space-efficient 8-layer layout, this robust system manages up to 1.35MW of total thermal cooling capacity.
Its advanced design features a heavy-duty 30kW vertical multistage pump and dedicated 1-on-1 PDU switching for precise power regulation. These integrations guarantee balanced hydraulic circulation across all 8 layers while maintaining low pressure drop and maximizing electrical safety.
Built with a reinforced steel cabinet structure and high-quality CDL-CDF pumps, the rack supports customizable CDU setups and scalable site layouts. Backed by real-time monitoring and leak protection, it delivers a flexible, high-efficiency liquid cooling solution for professional operations.
Core Advantages

01. Space-Saving Rack Design
Features an optimized 8-layer vertical rack structure holding 30 miners per layer. This high-density open layout integrates 240 slots, reducing floor footprint while maximizing indoor space utilization for 1.35MW operations..

02. Leak-Proof Quick Connectors
Utilizes industrial-grade, dual-sealing quick-connect fittings and robust water hoses. The smart bi-directional valve mechanism prevents any coolant dripping or water leakage during individual miner hot-swaps or routine maintenance.

03. Advanced Integrated CDU System
Integrates a high-capacity Coolant Distribution Unit (CDU) driven by a heavy-duty 30kW vertical multistage pump. This industrial setup ensures high-velocity, uniform heat exchange across all 240 active slots, maintaining temperature stability.

04. Intelligent Electric Leakage Detection
Incorporates active residual current monitoring and moisture leak detection loops. The system instantly detects any coolant leakage or electrical insulation degradation, automatically isolating the affected circuit to prevent hazards and protect valuable hardware.

05. 1-on-1 Control PDU Cabinet
Equipped with an industrial power cabinet featuring dedicated 1-on-1 PDU switching. Each of the 240 server slots has an independent, labeled breaker, allowing operators to safely service individual units without disrupting the entire system.

06. Smart PLC Control System
Powered by an intelligent PLC controller with an interactive touchscreen. It tracks real-time flow rates, pipeline pressures, temperature curves, and leak alarms, enabling operators to manage overall power draw and execute remote fault diagnosis.
Full Specifications
External dimensions
L:6025mm、W:1500mm、H:2700mm
Internal dimensions
L:6025mm、W:1500mm、H:2700mm
Weight
3800KG
Model | AP-A240 | Installed capacity | 240 Seat |
Installed powerload | 1320 kW | Power of the light-duty vertical multistage pump | 30 kW |
Power of the fluid replenishing pump | 0.2 KW | Total power of the dry cooling tower fan | 133 kW |
Total power of the closed cooling tower fan | 17.6 kW | Total power of the closed cooling tower spray pump | 5.5 kW |
System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 22-42 ℃ |
Coolant circulation demand of a single machine | ≥0.5 m³/h | Total demand for circulating coolant within the system | ≥6 m³ |
Molded Case Circuit Breaker | 160 A | Residual Current Circuit Breaker | 800 A |
Contactor | 9 A | Intermediate relay | 24 V |
CUL certified frequency converter | 380 V |
240-Slot Antminer Hydro Cooling Rack Product Brochure
Complete product specifications, installation guide, and operational instructions.
Certification Standards
Our products meet leading international standards for safety, reliability, and performance.

China Classification Society
Marine & offshore compliance

UL Listed
Safety tested & certified

CSA Certified
North American compliance

CE Marking
European conformity
Complete Cooling Solutions
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
❄️ Cooling Capacity |
⚙️ Miner Slots |
📏 Dimensions (L × W × H) |
🏢 Application |

28-Slot Antminer Hydro Cooling Rack
154 kW |
28 Slots |
1,000 × 1,000 × 2,000 mm |
Mid-to-LargeMining Operations |

110-Slot Antminer Hydro Cooling Rack
620 kW |
110 Slots |
4,880 × 1,300 × 2,700 mm |
Large-scale Mining Operations |

154-Slot Antminer Hydro Cooling Rack
870 kW |
154 Slots |
4,880 × 1,500 × 2,700 mm |
Large-scale Mining Operations |
Compare

240-Slot Antminer Hydro Cooling Rack
1350 kW |
240 Slots |
6,025 × 1,500 × 2,700 mm |
Large-scale Mining Operations |
240-Slot Antminer Hydro Cooling Rack FAQs
Yes. Designed with redundant dual loops and dual CDUs, the system supports independent single side operations. This allows operators to run one hundred twenty slots at fifty percent capacity during utility restrictions or active maintenance without shutting down the entire megawatt scale facility.
To guarantee safe international transit, this heavy rack is shipped fully pre assembled inside a reinforced ocean worthy wooden crate. The structures are securely bolted down with heavy duty protective packaging, minimizing any risk of physical impact damage during long overseas cargo freight.
We offer complete customization for the integrated power cabinet, adapting the circuit breakers and wiring to match local grid standards like North American four hundred eighty volts. Additionally, pipe manifolds and CDU layouts can be tailored to fit your specific indoor mining facility.
