25.2MW Turnkey Bitcoin Mining Infrastructure in Addis Ababa, Ethiopi
Project Description
Securing a direct 25.2MW tap from a renewable substation outside Addis Ababa, an overseas investment group needed rapid infrastructure to utilize Ethiopia’s low-cost hydropower. Because regional supply chains for high-voltage electrical switchgear are limited, we delivered 12 units of our 2.1MW 364-Slot Antminer Hydro Cooling Container 40FT HQ, providing a complete turnkey bitcoin mining infrastructure housing 4,368 miners.
At an elevation exceeding 2,300 meters, thinner air reduces natural heat convection. We compensated by integrating oversized closed-loop dry coolers and mounting overhead green shade netting to block intense equatorial solar radiation. Factory pre-wiring allowed our engineers to bypass local equipment shortages, completing substation busbar connections, transformer landings, and primary water loop testing in ten weeks.
The 25.2MW facility runs at continuous capacity on 100% clean hydroelectric power. Supply coolant remains safely below 36°C even during peak midday sun, maintaining an operating PUE of 1.038 across all 4,368 Antminer hydro ASICs without high-altitude thermal derating.
About Ada
I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization. I also work closely with engineering and sales teams to translate technical data into practical insights for customers and partners. I believe mining technology should be communicated clearly and transparently, supported by real data and measurable performance. Outside of work, I enjoy yoga, reading, and traveling.
View all posts by AdaRelated posts
420-Slot ASIC Liquid Cooling Container Project in Reykjavik
420-Slot Modular Bitcoin Mining Container Facility in Edmonton
25.2MW Turnkey Bitcoin Mining Infrastructure in Addis Ababa, Ethiopi
Scaling 10 x 2.1MW 364-Slot Antminer Hydro Containers in Dubai
25.5MW Water-Cooled Bitcoin Mining Facility in Tashkent, Uzbekistan
308-Slot Hydro Cooling Container Deployment in Atlanta, Georgia
Search Blog
Recent Posts
For media inquiries, please contact
info@apexto.com.cn