Scaling 10 x 2.1MW 364-Slot Antminer Hydro Containers in Dubai
Project Description
The client secured 21MW of substation capacity near Dubai, but their plot was too narrow for standard containers with separate ground radiator yards. To solve the space constraint, we supplied 10 units of our 2.1MW 364-Slot Antminer Hydro Cooling Container 40FT HQ. Mounting the cooling units directly on the container roofs allowed all 3,640 miner slots to fit onto a single concrete apron.
Because UAE labor regulations restrict outdoor work during extreme midday summer heat, having internal switchgear, cabling, and hydraulic pumps pre-assembled at the factory was critical. On site, field work was strictly limited to craning the units onto footings, landing transformer feeds, and filling the water loops. The entire ten-container plant reached energization in eight weeks.
Since entering operation, the site has run continuously through summer ambient highs of 48°C (118°F). The closed-loop rooftop coolers keep supply water temperatures below 38°C, preventing chip down-clocking across all 3,640 hydro miners while holding the overall site PUE steady at 1.04.
About Ada
I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization. I also work closely with engineering and sales teams to translate technical data into practical insights for customers and partners. I believe mining technology should be communicated clearly and transparently, supported by real data and measurable performance. Outside of work, I enjoy yoga, reading, and traveling.
View all posts by AdaRelated posts
500kW Antminer Water Cooler Garage Cluster in Bavaria
Project Description
eplacing loud fan rigs with our antminer water co...
9-Slot Antminer Water Cooler Oslo Home Heating Project
Project Description
Hooking up our antminer water cooler gave a homeo...
35kW Antminer Water Cooler Garage Heating in Helsinki
Project Description
Installing our antminer water cooler gave a DIY m...
6-Slot Antminer Home Water Cooler in a Berlin Apartment
Project Description
Installing our antminer home water cooler allowed...
15-Unit Antminer Water Cooler Testing Lab in Seoul
Project Description
Deploying our antminer water cooler gave a tech l...
4-Slot Antminer Water Cooler Home Deployment in London
Project Description
Setting up our 4-slot antminer water cooler gave ...
Search Blog
Recent Posts
For media inquiries, please contact
info@apexto.com.cn
Solo Miner
Bitcoin
Dogecoin
Aleo
Kaspa
ALPH
Nexa
ETC
CKB
Dash
Kadena