4.8MW Integrated Hydro Mining Container Deployment in Austin, Texas

0
Apexto 1.2MW Hydro Cooling Container Project

Project Description

To quickly monetize industrial power in Austin, Texas, an enterprise operator selected our 1.2MW 210-Slot Integrated Antminer Hydro Mining Container 40FT HQ to eliminate protracted site builds. We deployed 4 units to establish a 4.8MW footprint. Unlike split systems requiring separate radiator yards, each all-in-one hydro mining container embeds an onboard closed-loop cooling tower within the 40FT chassis, minimizing land disturbance and external piping.

Deployment followed a streamlined plug-and-play workflow: once placed on grade, the units required only main grid hookups and an initial water fill. Factory-calibrated, sealed fluid loops ensured hydraulic integrity straight off the truck, elimina.ting on-site pipe welding and allowing complete four-unit site commissioning in just four weeks.

Operating through Central Texas summer heatwaves exceeding 40°C (104°F), the facility sustains peak hashrates with zero thermal down-clocking. The integrated cooling towers maintain an operating PUE below 1.04, proving that an integrated hydro mining container provides megawatt-scale operators the fastest route to reliable, low-maintenance liquid cooling