Project Description
An energy group in Charlotte, North Carolina, secured 10MW of utility power and planned an outdoor facility dedicated to heavy 3U server hardware. The project required high space efficiency and reinforced infrastructure capable of handling dense server-grade miners. To meet these site parameters, we delivered 8 units of our antminer 3u hydro container.
Each 40-foot container features a 104-slot dual-row layout equipped with 3U sliding rails, electrical distribution, and dedicated closed-loop dry coolers. The rail mechanism allows technicians to slide out and service heavy miners safely, while the internal layout improved overall site space efficiency by thirty percent compared to standard modular designs.
From transformer pad placement to final water loop commissioning, the project took five weeks to complete. The 10MW facility was energized in 2024, cutting ongoing energy costs by twenty-two percent and generating $1.25M in annual operational savings through balanced liquid circulation across all 832 server-grade slots.
About Ada
I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization. I also work closely with engineering and sales teams to translate technical data into practical insights for customers and partners. I believe mining technology should be communicated clearly and transparently, supported by real data and measurable performance. Outside of work, I enjoy yoga, reading, and traveling.
View all posts by AdaRelated posts
8-Unit 10MW Antminer 3U Hydro Cluster in Charlotte
Project Description
An energy group in Charlotte, North Carolina, sec...
Five 104-Slot Antminer 3U Hydro Containers in Frankfurt
Project Description
A commercial infrastructure firm in Frankfurt had...
48kW Bitmain ANTRACK V2 Home Heating in Salt Lake City
Project Description
Installing our bitmain antrack v2 allowed a homeo...
96kW Bitmain ANTRACK V2 Workshop Heating in Zurich
Project Description
Setting up the bitmain antrack v2 solved a winter...
Silent 70kW Antminer Hydro Cooling Rack Garage Cluster in Texas
Project Description
Setting up our antminer hydro cooling rack helped...
12-Slot Antminer Water Cooler Basement Project in Vancouver
Project Description
Setting up our antminer water cooler solved a ser...
Search Blog
Recent Posts
For media inquiries, please contact
info@apexto.com.cn
Solo Miner
Bitcoin
Dogecoin
Aleo
Kaspa
ALPH
Nexa
ETC
CKB
Dash
Kadena