Five 104-Slot Antminer 3U Hydro Containers in Frankfurt

0
Apexto 2.4MW Hydro Project

Project Description

A commercial infrastructure firm in Frankfurt had 6.25MW of available power and planned a mining facility within an active logistics park. The project required modular equipment due to strict municipal construction permits and limited asphalt space between existing warehouse buildings.

For the client, we delivered 5 units of our antminer 3u hydro container, installed 520 server-grade 3U ASIC miners, and completed all utility connections. The installation featured 104-slot horizontal racks, pre-assembled internal piping, an integrated closed-loop fluid circuit, and secondary electrical distribution to minimize on-site assembly and prevent flow decay.

From crane placement to final electrical commissioning, the project took under three weeks to complete. The facility was energized in 2024 and has run continuously at full capacity without thermal downtime. Stable grid power and low cooling overhead maintain steady operating margins, confirming that utility-scale liquid mining can be effectively deployed on asphalt yards without erecting permanent buildings.