210-Slot Bitmain ANTSPACE HW5 Container Project in Texas
Project Description
Tying 24MW directly into high-voltage transmission lines across the Texas plains required extreme spatial density and rapid setup. The operator deployed 20 units of the Bitmain ANTSPACE HW5 210-Slot 1.2MW 40HQ Hydro Mining Container, supporting up to 4,200 ASICs. The standardized Bitmain ANTSPACE HW5 container reduced total required concrete pad acreage by forty percent.
Traditional cooling setups would have required extensive field pipe welding and civil prep. Instead, each unit arrived factory-assembled with internal power distribution and top-mounted hybrid cooling towers. Staging crews placed the enclosures directly onto concrete ribbons, slashing on-site installation labor by seventy-five percent and accelerating high-voltage grid energization.
During peak summer heat, the hybrid system sprays a thin water film across dry coils only when ambient temperatures spike, delivering a verified 1.017 operating PUE. The synchronized 20-container array maintains balanced loop pressures and steady supply fluid temperatures across the entire 24MW continuous load.
About Ada
I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization. I also work closely with engineering and sales teams to translate technical data into practical insights for customers and partners. I believe mining technology should be communicated clearly and transparently, supported by real data and measurable performance. Outside of work, I enjoy yoga, reading, and traveling.
View all posts by AdaRelated posts
1-to-6 Setup: 20-Slot Hydro Mining Cabinet in Utah
Project Description
Running miners in Utah’s high-altitude desert bri...
1-to-3 20-Slot Antminer Water Cooling Cabinet Setup in Asunción
Project Description
A mining team in Asunción, Paraguay, wanted to ru...
36-Slot Antminer Hydro Cooling Rack Project in Stockholm
Project Description
A warehouse operator in Stockholm, Sweden, wanted...
36-Slot Hydro Cooling Cabinet Solar Farm in Hamburg
Project Description
A farm owner near Hamburg, Germany, wanted to run...
210-Slot Bitmain ANTSPACE HW5 Container Project in Texas
Project Description
Tying 24MW directly into high-voltage transmissio...
210-Slot ANTSPACE HW5 Hydro Container Project in Alto Paraná
Project Description
Building a 14.4MW facility beside an ecological w...
Search Blog
Recent Posts
For media inquiries, please contact
info@apexto.com.cn
Solo Miner
Bitcoin
Dogecoin
Aleo
Kaspa
ALPH
Nexa
ETC
CKB
Dash
Kadena