210-Slot Bitmain ANTSPACE HW5 Container Project in Texas

0
ANTSPACE HW5 Antminer Hydro-Cooling Container Mining Case Study

Project Description

Tying 24MW directly into high-voltage transmission lines across the Texas plains required extreme spatial density and rapid setup. The operator deployed 20 units of the Bitmain ANTSPACE HW5 210-Slot 1.2MW 40HQ Hydro Mining Container, supporting up to 4,200 ASICs. The standardized Bitmain ANTSPACE HW5 container reduced total required concrete pad acreage by forty percent.

Traditional cooling setups would have required extensive field pipe welding and civil prep. Instead, each unit arrived factory-assembled with internal power distribution and top-mounted hybrid cooling towers. Staging crews placed the enclosures directly onto concrete ribbons, slashing on-site installation labor by seventy-five percent and accelerating high-voltage grid energization.

During peak summer heat, the hybrid system sprays a thin water film across dry coils only when ambient temperatures spike, delivering a verified 1.017 operating PUE. The synchronized 20-container array maintains balanced loop pressures and steady supply fluid temperatures across the entire 24MW continuous load.