This small‑scale turn‑key project was built for a private investor holding access to cheap hydroelectric power. The scope covered one 40‑foot container hosting 264 ASIC units, power distribution cabinet installation, and forced‑air cooling setup.
Our team handled site survey, electrical design, hardware procurement, on‑site assembly and final testing. Total project lead time was only 6 weeks.
The site operates 24/7 under full load. Thanks to low‑cost hydro power, operational expenses remain very competitive. The estimated payback period for this compact deployment is 14‑16 months. This solution is ideal for first‑time mining investors looking for lower‑capital entry.
關於艾達
我是 Apexto Mining 的資料分析師,自 2017 年以來一直從事加密貨幣挖礦行業。我的工作重點是分析 ASIC 礦機的性能、散熱效率和挖礦收益,尤其是在水冷和浸沒式冷卻環境下。我參與技術研究和內容創作,包括撰寫部落格文章和有關挖礦硬體及基礎設施優化的教育材料。我還與工程和銷售團隊緊密合作,將技術數據轉化為對客戶和合作夥伴切實可行的見解。我相信挖礦技術應該以清晰透明的方式進行溝通,並以真實數據和可衡量的性能為支撐。工作之餘,我喜歡瑜珈、閱讀和旅行。
查看艾達的所有帖子





