Delivered Turnkey Bitcoin Mining Infrastructure & Facilities

End-to-end engineering, advanced cooling infrastructure, and turnkey power deployment for utility-scale mining operations worldwide.

DELIVERED CASE STUDIES

Project Portfolio

Browse our portfolio of delivered infrastructure projects across advanced cooling, power systems, containerized mining, and turnkey deployment solutions.

Reykjavik, Iceland

480-Slot Antminer Hydro Cooling Container Case Study

Power Capacity

12MW

Status

Operational

Edmonton, Canada

2.4 MW Slot Antminer Hydro Container Deployment Case Study

Power Capacity

28.8MW

Status

Operational

Addis Ababa, Ethiopi

Deployment Case Study: 2MW Antminer Hydro Mining Container

Power Capacity

25.2MW

Status

Operational

Dubai, UAE

Deployment Case Study: 364-Slot Antminer Hydro Mining Container

Power Capacity

21MW

Status

Operational

Tashkent, Uzbekistan

Antminer Hydro Cooling Container Case

Power Capacity

25.5MW

Status

Completed

Atlanta, Georgia

480-Slot Antminer Hydro Cooling Container Case Study

Power Capacity

10.2MW

Status

Operational

Santiago, Chile

Apexto 1.2MW Hydro Container Project

Power Capacity

12MW

Status

Operational

Austin, Texas

Apexto 1.2MW Hydro Cooling Container Project

Power Capacity

4.8MW

Status

Completed

Calgary, Canada

Apexto Calgary, Canada 8 x 1.2MW Hydro Project

Power Capacity

9.6MW

Status

Completed

Reykjavik, Iceland

480-Slot Antminer Hydro Cooling Container Case Study

Power Capacity

12MW

Status

Operational

Edmonton, Canada

2.4 MW Slot Antminer Hydro Container Deployment Case Study

Power Capacity

28.8MW

Status

Operational

Addis Ababa, Ethiopi

Deployment Case Study: 2MW Antminer Hydro Mining Container

Power Capacity

25.2MW

Status

Operational

Dubai, UAE

Deployment Case Study: 364-Slot Antminer Hydro Mining Container

Power Capacity

21MW

Status

Operational

Tashkent, Uzbekistan

Antminer Hydro Cooling Container Case

Power Capacity

25.5MW

Status

Completed

Atlanta, Georgia

480-Slot Antminer Hydro Cooling Container Case Study

Power Capacity

10.2MW

Status

Operational

Santiago, Chile

Apexto 1.2MW Hydro Container Project

Power Capacity

12MW

Status

Operational

Austin, Texas

Apexto 1.2MW Hydro Cooling Container Project

Power Capacity

4.8MW

Status

Completed

Calgary, Canada

Apexto Calgary, Canada 8 x 1.2MW Hydro Project

Power Capacity

9.6MW

Status

Completed

CASE STUDY HIGHLIGHT

2.4 MW Hydro Mining Project, Russia

Location

Russia

Project Overview

A major institutional operator in Uzbekistan was developing a 17MW facility and wanted to diversify its hardware across Antminer, Whatsminer, and Avalon.

The challenge was infrastructure compatibility. Each brand uses different plumbing, coolant flow rates, connectors, and power requirements. Instead of managing containers from multiple suppliers, the client needed one manufacturer to engineer a unified 17MW infrastructure supporting all three platforms.

Capacity

2.4MW

Deployment

Containerized

Cooling Method

Hydro Cooling

Status

Completed

Completion Time

2025

GLOBAL FOOTPRINT

Completed Projects Worldwide

Delivering reliable mining infrastructure solutions across strategic markets across the globe.

Ready to Build Your Mining Farm?

Share your power parameters and basic project details. Our engineering team will review your case and get in touch quickly to discuss your power layout, cooling plan, and budget estimate.