Irkoutsk, Russie · 2023

0
Transformateur de 750 kVA pour l'infrastructure d'alimentation électrique du minage de Bitcoin

This small‑scale turn‑key project was built for a private investor holding access to cheap hydroelectric power. The scope covered one 40‑foot container hosting 264 ASIC units, power distribution cabinet installation, and forced‑air cooling setup.

Our team handled site survey, electrical design, hardware procurement, on‑site assembly and final testing. Total project lead time was only 6 weeks.

The site operates 24/7 under full load. Thanks to low‑cost hydro power, operational expenses remain very competitive. The estimated payback period for this compact deployment is 14‑16 months. This solution is ideal for first‑time mining investors looking for lower‑capital entry.