Scalable & High-Performance Design

  • Seamless expansion to multi-MW capacity
  • Optimized cooling for extreme environments (-30°C to 50°C)
  • Plug-and-play compatibility with all miners

Rapid Deployment

  • Preassembled units reduce on-site work by 80%, deploy in ≤3 days
  • Smart control for stable, efficient performance
  • Cost-effective, on-demand delivery with proven supply chain

Worry-Free Warranty

  • Lowest TCO with mature supply chains
  • 1-year service + 3-tier spare parts network
  • Reliable performance in all climates
ගිල්වීමේ කැණීම් කට්ටලය B100

B100 Tank

Best Practices for Immersion
Cooling Containers

100kW Cooling Capacity

Supports both air-cooled and immersion-ready miners with various power specifications.

98% Miner Compatibility

Supports both air-cooled and immersion-ready miners with various power specifications.

Individual Power Control

Each Miner, pump, and dry cooler can be powered on/off locally and remotely.

Intelligent Operation

Precise temperature auto adjustment with a web portal for smooth operation

foghashing B100 TANK
foghashing B100 TANK
B100 TANK

B100 CLUSTER

Deploy Indoors? Easy !

For warehouse deployments, we designed the B100 Cluster as a pre-assembled super module, delivering a plug-and-play installation experience.

1MW Cooling Capacity

10 × B100 tanks are arranged in a dual-loop, connected to an outdoor dry cooler.

Skid-mounted Module

Tanks, power panels, CDU, and piping are skid-mounted as a super module.

Efficient Fluid Distribution

Dual-loop system with a simulated ring pipeline network design.

Intelligent Operation

PLC and a web-based monitoring system oversee the tank, dry cooler, and CDU.

Foghashing-BC40-LITE

BC40 ELITE

Best Practices for Immersion Cooling Containers

1MW Cooling Capacity

Tested cooling performance supports up to 200 miners, both air-cooled and immersion-ready.

Deploy in 3 Days

Single-loop system minimizes deployment and maintenance downtime.

Quality Electrical System

UL489-compliant electrical panels, cables, and Noark circuit breakers ensure high reliability.

Smart Monitoring & Control

Remote Fog web portal with full API support for seamless integration.

BC40Elite immersion container
Fog Hashing BC20 Elite
Fog Hashing BC20 Elite

Immersion Cooling Container In Action

Immersion Cooling Container BC40 Overview

Immersion Cooling Container BC40 Elite

Immersion Container BC40 Installation Case

5MW Immersion Cooling Containers at Full Operation

 

Immersion Container BC40 in Operation in UAE

 

1 FH  BC40 in operation in Australia

TESTIMONIALS

What Our Customers Say

Adelaide, Australia

"Our B24 containers have been running for two years and continue to perform beyond expectations. The miners stay online almost all the time—something traditional air-cooled farms couldn't match."

Texas, USA

"A high-density immersion container for Antminer S21 Imm.—solid performance and great support from the team during setup and operation. Proud to have it at our TX site"!

Abu Dhabi, UAE

"Bitcoin mining has never been this simple. The B100 runs incredibly stable—I’m already planning to expand with more units."

B24

North Dakota, USA

"The B24 containers performed flawlessly in -30°C conditions—far beyond expectations. Incredible cold resistance. Time to order more."

BC40Elite immersion container

BC40Elite Deployment

4 days to deploy, The top 1MW container solution!

Container Models: BC40 Elite

Operating Miners: S21 imm, S21, T21, M66

BC40Elite immersion container
BC40Elite immersion container
BC40Elite immersion container
BC40Elite immersion container
BC40Elite immersion container

Solar Mining Solution

Clean Energy Provides Power Supply for Mining

Container Models: BC40 Basic, BC40Pro

Operating Miners: S19 Jpro, S21, T21

Customized Mining Solution
with Whatsminer

High-Density Space Saving Solutions

Models: BC40 Pro, MC40

Operating Miners: M60, M66

Mining Solution to Combat
Extreme Heat Weather

Operating Stably for Over One Year at Above 40°C

Models: BC40 Pro

Operating Miners: S19J Pro

Flexible Configurations for
Mining Solution

Customized Based on the Power Requirements, Control Systems, and Software Operations

Models: BC40 Pro, BC40 Basic

Operating Miners: S19k Pro, M66

Other Cases

Get Your Container Customization Plan

Our containers are fully customizable to suit your needs. To create the best solution for you, please share your project details: location, ambient conditions, power load, miner types, and preferred layout.