몬테레이에 설치된 480슬롯 규모의 산업용 수력 비트코인 ​​채굴 설비

0
2.6MW 앤트마이너 수력 컨테이너 비트코인 ​​채굴장 구축 사례 연구

프로젝트 설명

An enterprise operator in Monterrey, Mexico, utilized continuous industrial power to build a 31.68MW mining facility. To maximize land productivity within their manufacturing campus, we delivered 12 units of our 2.64MW 480-Slot Antminer Hydro Cooling Container 40FT HQ. Packing 480 ASICs per chassis, the system enables high-density industrial hydro bitcoin mining within a compact footprint.

Delivering 12 heavy 40FT enclosures into Mexico was handled through specialized cross-border logistics. To accelerate installation, our after-sales engineering team guided local technicians via live video calls, supervising hydraulic manifold alignments and electrical terminations. This direct technical support enabled fast, error-free physical setup and pressure testing on site.

Operating under full 2.64MW thermal loads per container, the facility runs reliably in Monterrey’s dry, dusty industrial environment. The sealed closed loops shield all 5,760 miners from airborne factory particulates, maintaining balanced coolant flow and steady full-load hash output across the entire 31.68MW installation.