Product Description
Apexto Mining’s new batch of Whatsminer M60S+ (200–204 TH/s per unit, 17 W/T) hosted miners is available at our Dallas, USA mining farm. Get them at an exclusive price of $15.5/TH with a hosting fee of only $0.075/kWh! Spots are filling up fast—act now to secure yours!
Modello | WhatsMiner M60S+ |
Hashrate | 200–204T |
Efficiency | 17W/T |
Size | 430 x 155 x 226mm |
Weight | 13500g |
Overview / Plan details
Currency | Hosted Mining Farm | Valid Time | Hosting Fee |
BTC | Dallas, USA | Miners already mined for about 2 months | $0.0750/kWh |
Live Miner Stats
View real-time hashrate and uptime, with miners running stably and historical uptime at 90–95%.
Product Description
Apexto Mining’s new batch of Whatsminer M60S+ (200–204 TH/s per unit, 17 W/T) hosted miners is available at our Dallas, USA mining farm. Get them at an exclusive price of $15.5/TH with a hosting fee of only $0.075/kWh! Spots are filling up fast—act now to secure yours!
Modello | WhatsMiner M60S+ |
Hashrate | 200–204T |
Efficiency | 17W/T |
Size | 430 x 155 x 226mm |
Weight | 13500g |
Overview / Plan details
Currency | Hosted Mining Farm | Valid Time | Hosting Fee |
BTC | Dallas, USA | Miners already mined for about 2 months | $0.0750/kWh |
Live Miner Stats
View real-time hashrate and uptime, with miners running stably and historical uptime at 90–95%.
Fee Description
Miner Price: $15.5 per TH (each unit 200–204 TH/s, M60S+ with 17W efficiency).
Hosting Deposit: Two months of estimated electricity fees are required in advance.
Hosting Fee: $0.0750 per kWh, covering both electricity and maintenance.
Repair Policy: The manufacturer provides a 360-day warranty from the shipping date (miners have already run for about 60 days). After the warranty expires, repair costs will be charged based on actual conditions.
Exit Fee: Includes mining farm decommissioning and miner transportation, charged based on actual costs and borne by the user.
Note: Apexto guarantees your miner will be up and running for the first 15 days. If any issues occur within this period, the mining farm will immediately replace the machine or provide free repairs.
Miner Purchase and Hosting Process
1. Purchase Miner & Prepay Electricity
Choose your preferred miner and hosting plan, and prepay 2 months of electricity fees.
2.Configure Miner
Set up your mining pool and wallet. After payment, hashrate will be assigned to your account within 72 hours.
3.Start Mining
Begin mining and receive your rewards in real time.
Farm Information
- Farm Capacity:30MW
- Hosting Fee:0.0750/kWh
- Historical Uptime Rate:90%~95%
- Hosted Mining Farm: located in Dallas, USA.
Domande frequenti
A: Hosting is available for miners purchased through Apexto Mining. On the product page, simply choose your preferred miner and hosting plan, submit your order, and we will contact you to process your hosting setup as soon as possible.
A: Hashrate will be assigned to your account within 72 hours after payment.
A: Billing is based on your miner’s actual or rated power consumption, whichever is higher. Here’s an example for the M60S (200T | 17 W/T)
Investment Calculation (per unit):
Machine Cost: 200T × $15.5/T = $3,100
Power Efficiency: 17 W/TH
Unit Power Draw: 200T × 17 W = 3,400 W (3.4 kW)
Monthly Electricity Cost: 3.4 kW × $0.075/kWh × 24h × 30 days = $183.6
Upfront Payment (per unit):
Machine: $3,100
Electricity Deposit (2 months): $367.2
Total: $3,467.2
The electricity deposit will be used to offset the final bills upon contract completion.
MOQ 5 Units Total: $3,467.2 × 5 = $17,336
A: Installations are scheduled in the order payment is completed. Any delay in completing payment will push your install date. Users who complete everything promptly receive priority onboarding and setup.
A: Your next invoice will be issued at the end of the first month and is due at the start of the second month. Please ensure your payment is ready at the beginning of month two.
Disclaimer
1.As agreed, once the purchase is completed, no exchanges or refunds will be accepted.
2.Apexto Mining reserves the final right of interpretation for this sale.
3.Apexto Mining will not be responsible for any consequences caused by uncontrollable risks, including but not limited to natural disasters such as floods, volcanic eruptions, earthquakes, landslides, fires, storms, or other extreme weather events; government actions or directives; power grid supply incidents; and social events or conflicts such as wars, strikes, or riots.
Minatore solitario
Bitcoin
Dogecoin
Aleo
Kaspa
ALPH
Nexa
ETC
CKB
Trattino
Kadena







Recensioni
Non ci sono ancora recensioni.